Lennox Hearth ULC-S610 Indoor Fireplace User Manual


 
Roof Down Slope Hole Size
SLOPE ASHT+ / HT6103+ S-2100+ / HT6000+ AC
Roof Pitch 6” 6” 6”
0 * 12-3/8” (314 mm) 14-1/8” (359 mm) 15” (380 mm)
2/12 12-9/16” (319 mm) 14-3/8” (365 mm) 15 3/8” (390 mm)
4/12 13” (330 mm) 14-7/8” (378 mm) 16 1/8” (410 mm)
6/12 13-7/8” (352 mm) 15-3/4” (400 mm) 16 7/8” (430 mm)
8/12 14-7/8” (378 mm) 17” (432 mm) 18 1/4” (465 mm)
10/12 16-1/8” (410 mm) 18-3/8” (467 mm) 19 5/8” (500 mm)
12/12 17-1/2” (445 mm) 20” (508 mm) 21 3/8” (545 mm)
* Cross Slope Hole Size
Put the chimney cap into place.
Wash the roof flashing with a solvent or vinegar, then paint it with rust-proof paint.
Table 3
Figure 24
Figure 25
Figure 31
Minimum Chimney Height Using Elbows
Fireplace Model MONTE
Chimney Model ASHT+ / S2100+ / HT6103+ / HT6000+ / AC
Vertical installation 12 feet (3.66 m)
Two (2) elbows 15 feet (4.57 m)
Four (4) elbows 17 feet (5.18 m)
Table 4
After reaching the location requiring the
elbow, proceed as follows:
ASHT+ / HT6103+ / S-2100+ / HT6000+
Chimneys
1. Install the first elbow; turn it in the required
direction. Fasten it to the chimney with
thethree(3)1/2”(12mm)metalscrews
provided with the elbow.
2. Install the necessary chimney lengths to
achieve the required offset. Lock the chimney
lengths together: it is recommended to use
three(3)1/2”(12mm)screws.Iftheoffset
length is made of two (2) chimney lengths or
more, use an offset or roof support halfway
up the offset. If penetrating a wall, install
a wall radiation shield (see Figures 27 and
29).
3.Use another elbow to turn the chimney
vertically. Secure the elbow, using three
(3)1/2”(12mm)screws(providedwiththe
elbow).
4.Useaplumb-bobtolineupthecenterof
the hole. Cut a hole for the chimney in the
ceiling/oor.Framethisholeasdescribed
previously (refer to section Chimney Instal-
lation Instructions).
5. From below, install a firestop (See Figure
22a).
6. A support (ST or SO) must be used on the
first 15’ section (5 m).
7. Continue with the regular installation.
AC Chimney
1. Install the first elbow. Turn it in the required
direction.Tolockitinplace,turn1/8ofa
turn. Fasten the straps attached to the elbow
to the surrounding frame, using nails or
drywall screws (see Figure 27).
2. Install the necessary chimney lengths to
achieve the required offset. Lock the chimney
lengths together. If penetrating a wall, use
a wall radiation shield.
3.Use another elbow to turn the chimney
vertically. Lock it to the chimney. Fasten
the straps attached to the elbow to the
surrounding framing using nails or drywall
screws.
4.Useaplumb-bobtolineupthecenterofthe
hole. Cut a hole for the chimney in the ceiling.
Frame this hole as described previously.
5. From below, install a firestop (see Figure
22c).
6. Continue with the regular installation.
Note: When using AC chimney, an AC6SB
starter section must be used before install-
ing an elbow. When an offset is needed
immediately off the top of the fireplace, an
elbow starter section, AC6SB30 (H3780), is
available.
AC
Air Cooled Chimney
Collar
Chimney
Flashing
OFFSET CHIMNEY INSTALLATION
After reaching the location requiring the elbow, proceed as follows. The minimum chimney height
when using elbows is:
Spacer (built
into flashing)
Notes:
Must return to vertical before penetrating ceiling or floor.
A maximum of 2 offsets are allowed.
NOTE:DIAGRAMS&ILLUSTRATIONSARENOTTOSCALE.
14