Honeywell EN2H-0221GE51 R0808 Heating System User Manual


 
SDC / DHC Hydraulic Components
EN2H-0221GE51 R0808 193
For hot-water loading without heating (tank priority), the number
of heat generators is limited by the setting in the quick hot-water
connection parameter.
With parallel operation (heating circuit and hot-water demand
simultaneously), there is no stage number limitation.
With active hot-water loading, reversion of stages occurs under
consideration of the configured switch-off delay.
If heating circuit operation is active with more stages than were
enabled for hot-water circuit operation and hot-water loading then
occurs in priority mode, the stages above and beyond the number
of stages enabled for hot-water loading are switched off directly.
Reversion of the activated stages does not occur in parallel
operation.
The "stage sequence switch-over power" must be taken into
account for connection of the following stage.
Example:
Cascaded system with five stages
Parameter 02 = 1 min.
Parameter 03 = 2 min.
Parameter 09 = 3 min.
Heating
WEZ1 WEZ2
WEZ3 WEZ4 WEZ5
1min 1min 1min 1min
2min 2min 2min 2min
Connection and disconnection with the configured delay of
parameters 02 and 03.
Tank priority (no heating demand):
WEZ1 WEZ2
WEZ3 WEZ4 WEZ5
10s 10s
2min 2min
Connection immediately with minimum delay
Reversion with configured delay P3