Hearth and Home Technologies CB1200I-B Stove User Manual


 
R
Septemer 1, 2008
7014-083E
Page 11
CB1200-I Pellet Insert
Mark area of
floor to cut
Starter hole
Keep sharp edge of
metal floor away from
power cord
The firebrick (refractory), glass doors, screen rails,
screen mesh and log grates can be removed from a
factory-built firebox in order to gain minimum insert
opening requirements.
Any smoke shelves, shields and baffles may be
removed from a factory-built firebox if attached with
mechanical fasteners.
The metal floor of the factory-built firebox may be
removed to facilitate the installation of the insert only
when a 1 inch (25mm) airspace is provided between
the insert and the floor of outer wrap.
If the floor is made of thin metal, we recommend using
a Quarda-Fire floor protector, Part 811-0730, which is
available through your dealer.
Figure 11.1. Measure and mark the metal
floor for cutting. With a drill, make a starter
hole in each corner.
Figure 11.2. Using a saws-all, cut out the
floor.
Figure 11.3. Place the insert into the fac-
tory-built firebox. Ensure that the power
cord can not be damaged by the sharp metal
edge. You may need to cut out a notch to
accommodate the cord.
H. Removing Metal Floor of Factory-Built
Firebox