Installation
312747L 13
8. Set thermostat knob (TK) to desired spray material
conditioning temperature. Align temperature setting
to set point (SP).
NOTE: Set point (SP) is a “V” notch in the metal
bracket at the top of the thermostat dial. Maximum
setting is 140°F (60°C).
9. Install immersion heater cover (HC) with screws
(HS). See F
IG. 13.
10. Open junction box door and remove plug for appro-
priate heater wire. Install cord grip of bushing (302).
Route power cable (303) up through cord grip.
11. Press the top lever up on the power switch body
(BA, BB) and pull away from the junction box. Install
by pushing the power switch body onto the switch
lever post. Flip lever down to engage.
12. Loosen lugs 2 and 4 on immersion heater A power
switch (BA) or immersion heater B power switch
(BB). Insert power leads and tighten lugs.
13. Connect green wire to 102GND grounding lug.
Feed Pump and Agitator Kits
See manual 312769 for installation and operation
instructions.
F
IG. 14: Connect Immersion Heater
TK
HC
303
L
SP
FIG. 15: Immersion Heater Power Cables
303
BB
BA
302