Goodman Mfg SS-CPG180-240 Air Conditioner User Manual


 
prodUCT speCifiCaTions
prodUCT speCifiCaTions
SS-CPG180-240 www.goodmanmfg.com 15
roof CUrB insTallaTion
Curb installations must comply with local codes and should follow the established guidelines of the National Roong
Contractors Association.
Proper unit installation requires that the roof curb be rmly and permanently attached to the roof structure. Check for
adequate fastening method prior
to setting the unit on the curb.
Full perimeter roof curbs are available from the factory and are shipped unassembled. The installing contractor is responsible for
eld assembly, squaring, leveling, and mounting on the roof structure. All required hardware necessary for the assembly of the
sheet metal curb is included in the curb accessory package.
• Determine sucient structural support before locating and mounting the curb and package unit.
• Duct-work must be constructed using industry guidelines. The duct-work must be placed into the roof curb before mounting
the package unit. Our full perimeter curbs include duct connection frames to be assembled with the curb. Cantilevered-type
curbs are not available from the factory.
• Contractor furnishes curb insulation, cant strips, ashing, and general roong material.
• Support curbs on parallel sides with roof members. To prevent damage to the unit, the roof members cannot penetrate
supply and return duct openings.
Note: The unit and curb accessories are designed to allow vertical duct installation before unit placement. Duct installation
after unit placement
is not recommended.
See the manual shipped with the roof curb for assembly and installation instructions.

119
74



61
61


11¼
1
17²
17²
17²
1

1

77½
1
23