26
FRAMING FOR WALL CASE
Brick Veneer and Frame Construction
FASTENING WALL CASE
Figure 1 Figure 2
MAIN STUD
JACK STUDS
HEADER – 4" x 4" OR
2 - 2" x 4" ON EDGE
16-1/4" MIN. RAB71
16-1/2" MIN. RAB77
ADJUSTABLE FRAMING TO SECURE
THIS DIMENSION
42-1/4" MIN. (RAB71)
42-3/8" MIN. (RAB77)
JACK STUD
CRIPPLE
FINISHED FLOOR
SUB-FLOOR
Note: Do not remove the stiffener
support from inside the wall case
until the chassis is to be installed.
MAIN STUDS
JACK STUD
HEADER
MOUNTING
SCREW HOLE
LINTEL
Framing detail for this construction is as
shown in Figure 1. Note use of lintel under
first course of brick above the Zoneline
case. Do not use the case as a lintel.
Mounting screw holes shown are to be
made by the installer.
NO HOLES PERMITTED
IN BOTTOM OF CASE
(EXCEPTION -RAD10
DRAIN KIT)
Choice of attachment devices
through both ends of case or the
top. Mounting screw holes and
attachment devices by installer.
MAIN STUD
JACK STUD
2" MIN.
WOOD
SCREW
MOLLY
OR TOGGLE
BOLT
EXPANSION
ANCHOR
BOLT
NO HOLES PERMITTED IN
BOTTOM OF CASE
(EXCEPTION - RAD10
DRAIN KIT)