Emerson Process Management 2051 Carbon Monoxide Alarm User Manual


 
Quick Installation Guide
00825-0100-4101, Rev EA
June 2010
Rosemount 2051
15
Operation and Maintenance
Proof Test and Inspection
The following proof tests are recommended. Proof test results and corrective actions taken
must be documented at
www.emersonprocess.com/rosemount/safety/certtechdocumentation.htm in the event that
an error is found in the safety functionality.
Use "Table 1: Field Communicator Fast Key Sequence" to perform a Loop Test, Analog
Output Trim, or Sensor Trim. See the 2051 reference manual (00809-0100-4101) for
additional information.
Proof Test
This proof test will detect 99% of DU failures not detected by the 2051
automatic diagnostics.
1. Conduct a Loop Test. On HART host/communicator enter the Fast Key
Sequence 1, 2, 2.
a. Enter the milliampere value representing a high alarm state
b. Check the reference meter to verify the mA output corresponds to the entered value.
c. Enter the milliampere value representing a low alarm state
d. Check the reference meter to verify the mA output corresponds to the entered value.
2. Perform a minimum two point sensor calibration check using the 4-20mA range points
as the calibration points.
a. If necessary, use one of the “Trim” procedures available in the 2051 reference manual
to calibrate.
NOTE
The user determines the proof-test requirements for impulse piping.
Visual Inspection
Not required.
Special Tools
Not required
Product Repair
All failures detected by the transmitter diagnostics or by the proof-test must be reported.
Feedback can be submitted electronically at
www.emersonprocess.com/rosemount/safety/certtechdocumentation.htm.
The 2051 is repairable by major component replacement. Follow the instructions in the 2051
reference manual (document number 00809-0100-4101) for additional information.
Reference
Specifications
The 2051 must be operated in accordance to the functional and performance specifications
provided in the 2051 reference manual.
Failure Rate Data
The FMEDA report includes failure rates and common cause Beta factor estimates. This
report is available at www.emersonprocess.com/rosemount.
4101_QIG_RevEA.fm Page 15 Tuesday, June 29, 2010 9:26 AM