Delta F-25 Electric Heater User Manual


 
45
Installation Record
SECTION XIV - Installation Record
Measured
Rate
of
Input:
Thermostatic Mixing Valve Setting:
Measured Domestic Outlet Temperature:
Combustion Readings:
CO
2
O2
CO
The following items were completed during installation:
 Installation instructions have been followed and completed
 Check-out procedures have been followed and completed
 Information regarding the unit and installation received and left with owner / maintenance
 personal.
Installer Information
(Company)
(Address)
(Address)
(Phone Number)
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
_________________________________________________________________
%
%
ppm psig
gph
Nozzle Size
Pump Pressure
Nozzle Angle