Delta 174938 Indoor Furnishings User Manual


 
MultiChoice
®
Rough-In Installation
Rotate cartridge (1) so the words “HOT
SIDE” (2) appear on the left. Insert cartridge
assembly into valve body. Make sure the key
(3) on the cartridge is fully engaged with the
slot in the brass body (4). Slide bonnet nut (5)
over the cartridge and thread onto the body.
Hand tighten securely. Use volume control
handle to turn spline (6) counter clockwise
until it will no longer rotate. Remove handle
and set aside.
1
1
2
2
1
3
6
2
5
4
Plug both outlets with proper ttings. Check for leaks. After testing, remove cartridge, adapter,
shower and/or tub spout plug and ush system by slowly turning on water supply to purge valve
system of debris. After ushing, reinstall adaptor, cartridge, bonnet nut and cover. Install stops (1
& 2) in the models with stops and set to full open.
Note: Install stops as follows: Thread nut (1)
onto stem (2) as shown. Then press stem and nut assembly into body and tighten using
a 3/8", 6 point, deep well socket. With a at head screwdriver, adjust stem clockwise to
close and counterclockwise to open.
I.
H.
For back to back or reverse installations
(hot on right and cold on left): Rotate
cartridge (1) so the words “HOT SIDE” (2)
appear on the right. Install the cartridge
making sure that the key is fully engaged
with the slot in the brass body (See step C).
Slide bonnet nut (3) over the cartridge and
thread onto the body. Hand tighten securely.
Normal Installation
(changes not required)
Reverse
Installation
Cold
Hot
1
3
2
Back to Back installation.
6