Casablanca Fan Company C19546K Fan User Manual


 
8
MOUNTING BRACKET INSTALLATION CONT.
FAN PREPARATION
PAPER MOTOR
SHIELD
FIGURE 1.
Prepare for fan installation as follows:
Step 1. Remove the paper shield from the motor as
shown in Figure #1.
Step 2. Loosen the set screw making sure that end
of the Set Screw can not be seen within the motor
coupling as shown in (Figure #2). If so, you will need
to unscrew the Set Screw so that the tip of the Set
Screw does not remain in the path of the downrod.
CAUTION: Failure to fully lock in the
downrod before securely tightening the
set screw may cause the fan to separate
from the downrod and fall during normal
operation.
Perma•Lock™ Downrod
and Ball Assembly
FIGURE 2.
Step 1. Align the slotted holes in the ceiling plate
with the pilot holes you drilled in the wood support
structure. For proper alignment use slotted holes
directly across from each other.
Note: The isolators should be ush against the
ceiling.
Step 2. Place a at washer on each of the two
3” wood screws and pass the screws through the
slotted holes in the ceiling plate into the pilot holes
you drilled.
Step 3. Tighten the screws into the 9/64” pilot
holes; do not use lubricants on the screws. Do not
over tighten.
Joist
Ceiling Fan
Approved
Wiring Box
Washer
Wood
Screw
Note: On sloped ceilings, align
the canopy opening toward
the top or peak of the room.
PREPARATION HARDWARE
Set Screw
Allen Wrench
Canopy
Trim Ring