New Buck Corporation 21 Stove User Manual


 
Installation of (Optional) Close Clearance Shields and Pipe Shield
1. Taking close clearance side shields, hold up to side of stove leaving 1/4" gap between
shield and top of stove.
2. Make reference mark in center of pre-punched hole in top & bottom of shield. Drill two
(2) 3/32" holes in back of unit on each side. Insert self tapping screws in through shield into
stove.(SEE PICTURE BELOW)
3. Drill two (2) 3/16" holes in the sides of the stove where the shield meets the front side.
Insert two (2) 3/8" self-tapping screws. (SEE PICTURE BELOW)
4. Next loosen two (2) top screws holding side shield at rear top. Insert pipe shield where
back shield and top rear side shield meets. Leave a 1” gap from the top of stove to the pipe
shield, tighten screws.(SEE PICTURE BELOW)
Installation of (Optional) Close Clearance Shields
Installation of (Optional) Pipe Shield
1” TYP.
1/4” TYP.
13/16” TYP.
Pipe Shield
Close Clearance Shields
Close Clearance Shields
Loosen these top
shield screws
33