2. Servicing the liquid cooling circuit
The air hose fitting of the air pump must be of the Shrader valve type (A) to match with the pressure vessel,
so the Presta valve type (B) has to be removed. Futhermore, the pin (C) inside the Shrader valve has to be
removed as well.
A
B
A
A
B
C
C
Check within 24 hours whether the pressure has stabilized close to 1 bar. If not, search for leakage.
20 R59770032 COOLING LIQUID REFURBISHMENT 07/12/2006