AEG 8000038784_00_BAL_en Water Heater User Manual


 
Incorrect setting can have serious consequences for production efficiency.
Illustration 3.5: Step 4 of 7: Installed Power
To change the installed power, refer to
Setup, Calibration, PV Array
.
Step 5 of 7: Country setting
Select the country setting to match the installation. To meet medium voltage grid requirements
select a country option ending in MV.
The default setting is [undefined].
Select the country setting again, to confirm.
The setting is activated immediately.
Correct selection is essential to comply with local and national standards.
An incorrect setting can have serious consequences.
3. Web Server Quick Guide
8000038784_00_BAL_en / L00410565-01_02 15
3