Menu Structure - Production Log - Continued
Display Functions Description
[-] Time stamps
Installed: 31-12-07 Date of first grid connection
Power down: 21:00:00 When the inverter was last connected to grid
Prod. initiated: 06:00:00 When the inverter first connected to grid today
[-] De-rating
Total de-rate: 0 h
Period of time the inverter has limited power production in total, shown in
hours
Pwr level adjust: 0 h Due to Power level adjustment
Freq. stabiliza.: 0 h Due to frequency support
Reactive Power: 0 h Due to reactive energy support
[-] Reactive Power Only visible if the current country setting is an MV country or custom, and in
Protect PV versions.
[-] Reactive Energy (underexcited):
1000 000 VArh
[-] Reactive Energy (overexcited):
1000 000 VArh
[-] Event log
Latest event:
0
The latest event is displayed. The number is for service purposes
Zero indicates no error.
[-] Last 20 events The latest 20 events are displayed
1 : 29-01-2009 14:33:28 Date and time of the event
Grid 29 off Group - ID - Status of the event
2 : 29-01-2009 14:33:27
Grid 29 on
-
20:
Table 2.6: Production Log - Continued
2. Display
8000038784_00_BAL_en / L00410565-01_02 9
2