Weil-McLain CGA25SPDN Boiler User Manual


 
Part Number 550-101-009/0107
33
GOLD CGa Gas-Fired Water Boiler — Boiler Manual
Installation and service certificate
"OILERMODEL??????????????????3ERIES??????????#0NUMBER???????????$ATEINSTALLED???????????
-EASURED"TUHINPUT????????????????????
)NSTALLER????????????????????????????????????????????????????????????????????????????????
(company) (address) (phone)
)NSTALLERSSIGNATURE?????????????????????????????????????
Check-out procedure — checklist7
O "OILERANDHEATDISTRIBUTIONUNITSlLLEDWITHWATER
O !UTOMATICAIRVENTIFUSEDOPENONEFULLTURN
O !IRPURGEDFROMSYSTEM
O !IRPURGEDFROMGASPIPING0IPINGCHECKEDFORLEAKS
O #ORRECTLYSIZEDMANIFOLDORIlCESINSTALLED2EFERTO
4ABLE,
page 12 to check size and fuel type.
#ORRECTLYSIZEDMANIFOLDORIlCESMUSTBEUSED
Failure to do so will cause severe personal in-
jury, death or substantial property damage.
O Followed lighting/operating instructions on boiler or in
manual Section
or Section FORPROPERSTARTUP
O 0ROPERBURNERmAMEOBSERVED2EFERTO
#HECKBURNERmAME,
manual Section
D.
O Test limit control — While burners are operating, move
indicator on limit control below actual boiler water tem-
PERATURE"URNERSSHOULDGOOFFWHILECIRCULATORCONTINUES
to operate. Raise setting on limit control above boiler water
temperature and burners should reignite.
O Test additional field-installed controls — If boiler has a low
water cutoff, additional high limit or other controls, test for
OPERATIONASOUTLINEDBYMANUFACTURER"URNERSSHOULDBE
operating and should go off when controls are tested. When
controls are restored, burners should reignite.
O "UTTONONSPILLSWITCHPUSHEDIN
O Test ignition system safety device:
a.
3TANDINGPILOT — Turn gas cock knob to 0),/4posi-
tion and extinguish pilot flame. Pilot gas flow should
stop in less than 3 minutes. Put system back into op-
eration (see Section ).
b.
3PARKIGNITEDPILOT#ONNECTMANOMETERTOOUTLET
side of gas valve. Start boiler, allowing for normal
start-up cycle to occur and main burners to ignite.
With main burners on, manually shut off gas supply
ATMANUALMAINSHUTOFFGASVALVE"URNERSSHOULDGO
off. Open manual main shutoff gas valve. Manometer
should confirm there is no gas flow. Pilot will relight,
flame sensing element will sense pilot flame and main
burners reignite.
O Set limit control(s) to system temperature requirements.
Adjust balancing valves and controls to provide design
temperature to system.
O For multiple zones, adjust flow so it is about the same in
each zone.
O 6ERIFYTHERMOSTATHEATANTICIPATORIFAVAILABLESETPROP-
ERLY2EFERTO
&IELDWIRING, manual Section 5, page 27,
4HERMOSTATS.
O #YCLEBOILERWITHTHERMOSTAT2AISETOHIGHESTSETTINGAND
verify boiler goes through normal start-up cycle. Lower to
lowest setting and verify boiler goes off.
O Measure natural gas input:
a. Operate boiler 10 minutes.
b. Turn off other appliances.
c. At natural gas meter, measure time (in seconds) re-
quired to use one cubic foot of gas.
D #ALCULATEGASINPUT
3600 x 1000
number of seconds from step c
= Btuh
E "TUHCALCULATEDSHOULDAPPROXIMATEINPUTRATINGON
boiler rating label.
O #HECKMANIFOLDGASPRESSUREBYCONNECTINGMANOMETERTO
downstream test tapping on main gas valve. Manifold pres-
sure for natural gas should be 3.5" w.c. and for propane gas
should be 10" w.c.
O Observe several operating cycles for proper operation.
O Set room thermostat to desired room temperature.
O &ILLIN)NSTALLATIONANDSERVICECERTIlCATEBELOW
O Review all instructions shipped with this boiler with owner
or maintenance person. Return instructions to envelope
and give to owner or place in pocket inside front panel in
boiler.
O Installation instructions have been followed.
O #HECKOUTSEQUENCEHASBEENPERFORMED
O Above information is certified to be correct.
O Information received and left with owner/maintenance person