GOLD CGa Gas-Fired Water Boiler — Boiler Manual
10
Part Number 550-101-009/0107
Prepare boiler location — air openings
1e
Air openings must be provided
#OMBUSTIONAIRANDVENTILATIONOPENINGSMUSTCOMPLYTHE.ATIONAL&UEL
'AS#ODE!.3):LATESTEDITIONORAPPLICABLELOCALBUILDINGCODES
#ANADIANINSTALLATIONSMUSTCOMPLYWITH"OR")NSTALLATION
#ODES
Provide adequate combustion and ventilation air to
assure proper combustion and reduce the risk of severe
personal injury, death or substantial property damage
caused by flue gas spillage and carbon monoxide
emissions.
#OMBUSTIONAIROPENINGLOCATION ANDSIZING
REQUIREMENTSDEPENDONTHECLEARANCESAROUND
THEBOILER
#HECKTHEBOILERPLACEMENTCOMPARED
to Figure 1a, page 7.
)FALLCLEARANCESAREATLEASTEQUALTO&IGUREA
PAGE
, apply the sizing and placement of openings
given on pages 10 and 11.
)F!.9CLEARANCEISLESSTHAN&IGUREAPAGE,
you must provide air openings sized and located as
shown in Figure 1b, page 7.
$/./4 apply the sizing
and location information shown on page 10 or 11.