When a metal prefabricated chimney
is used, the manufacturer’s installation
instructions must be followed. You must
also purchase (from the same manufac-
turer) and install the ceiling support pack-
age or wall pass-through and “T” sec-
tion package, restops (where needed),
insulation shield, roof ashing, chimney
cap, etc. Maintain proper clearance to
the structure as recommended by the
manufacturer. The chimney must be the
required height above the roof or other
obstructions for safety and proper draft
operation.
654
24
25
7 8
30
29
27
26
31
32
33
34
30
35
36
34
30
31
20
21
22
23
18
19
13
15
16
17
14
13
3
2
1
11
912
10
38
28
37
718