Trane SCRH Air Conditioner User Manual


 
10 PKG-SVX14A-EN
Proper Lifting Procedure
Follow these instructions and reference
Figure I-PC-3.
1. Slide a fork lift into the opening
provided on the unit base. Move the
fork lift carefully.
2. Using slings, attach through the circular
holes provided on the unit base. Protect
the unit from damage by rigging
equipment.
WARNING
Improper Unit Lift!
Test lift unit approximately 24 inches
high to verify the proper center-of-
gravity lift point. To avoid dropping the
unit, reposition the lifting point if the
unit is not level. Failure to properly lift
the unit could result in death, serious
injury, or possible equipment/
property-only damage.
Installation
pre-installation
considerations
Figure I-PC-3. Proper unit lifting procedure