Sterling STT 800 Dehumidifier User Manual


 
3.6. Starting continuous operation
When you have carried through all basic settings, you can start with continuous operation.
F
Make sure that hop pers which are not in use are sep a rated from the de -
hu mid i fied air sup ply.
Make sure that the set dry ing tem per a tures are suited for the ma te ri als in
the hop pers.
Af ter first fill ing, do not pro cess the ma te rial un til af ter the dwell ing time.
If a re turn air cooler (op tional) is in stalled, switch on the cool ant cir cuit .
If a pre air cooler (op tional) is in stalled, switch on the cool ant cir cuit.
Make sure that the cool ing ap pli ance is con nected to the mains socket (if
pres ent, op tional).
Check set ting of the timer.
Select ”Main menu”.
Acknowledge with the ENTER-key.
or
Press the ”F2”-key.
Select ”Dryer on”.
Acknowledge with the ENTER-key.
526-2MS
STT 800
Start-up 3-18