Sterling SDA 1000-5100 Dehumidifier User Manual


 
Large Dehumidifying Dryers Mechanical Installation 24
3-5 Making Dryer/Drying Hopper Process Air Connections
When making process air connections to your dryer, ensure that you take into consideration
and make arrangements for the following:
; Use high-temperature flexible dryer hose or rigid tubing to connect the dryer to the
drying hopper.
; Keep the delivery (to the drying hopper) hose as short as possible to minimize heat
loss. Insulated hose is recommended and available for maximum energy savings.
; Do not use insulated hose on the return (from the drying hopper)
; Do not shorten the return hose. The return air to the blower must be 150°F or below.
; Make sure the hoses are not kinked.
; Drying hopper air inlet and outlet locations vary, but always connect the hoses so the
dry process air from the dryer enters the bottom of the drying hopper and flows out
the top to return to the dryer inlet.
Figure 8: Dryer/Drying Hopper Process Air Connections
Process Air Heater on Dryer Process Air Heater on Drying Hopper
Drying System with Dust Collector and
Process Air Heater on Dr
y
e
r