State Industries SBD71 120 Water Heater User Manual


 
SBD TANK TYPE HEATERS
SERVICE HANDBOOK
Technical Training Department
Ashland City, TN ©2003
40
STEP 18B MAIN GAS VALVE COIL CHECK
STEP 18B. MAIN GAS VALVE COIL CHECK – SBD 500 ONLY
Condition:
Pilot lights
Sparking stops
No main burner ignition
Test Procedure:
Power off
Disconnect red, main valve wire from module MV terminal
Meter set to test for DC amperage
10A wire to red gas valve wire, COM wire to MV terminal of ignition module
Turn power on to heater
After pilot lights and sparking stops
:NEHT :FI
.25 to .35 DC Amps is not present Replace the gas valve
.25 to .35DCA is present Main burner gas should ignite.
Be certain to correct you meter wire connections and setting before performing further
tests.
RED
WHITE
BLUE
MANIFOLD
PRESSURE
TAP
MANIFOLD
PRESSURE
TAP
PILOT GAS
MANIFOLD
GAS
The PV wire is connected to the blue wire
The MV/PV wire on the IID is connected to the white wire.
The MV wire is disconnected from the gas valve.