State Industries SBD71 120 Water Heater User Manual


 
SBD TANK TYPE HEATERS
SERVICE HANDBOOK
Technical Training Department
Ashland City, TN ©2003
38
STEP 17 IID MODULE TEST
Pilot is lit - Sparking has stopped.
STEP 17. IID MODULE TEST (Power to the Main Valve). Using a multimeter, test for
24 VAC between terminal MV on the IID and 24V (GND).
NEHT FI
24 VAC is not present: Replace the IID module. Conduct Step
18 before applying power to
replacement module.
24 VAC is present: Go to step 18.