Sears P/N93SR-D02 Air Conditioner User Manual


 
!
IMPORTANT INSTALLATION INSTRUCTIONS
1
MAN( _At. VERTIC_.[\i'F.R AD,I! LqTMF.NT
Complete this adjustment
before installing front panel
Verlical Louver
1. Adjust the vertical louvers to the straight
position by using the handle,
2., The control panel and knobs are packed
separately. To install them, refer to installing
"Front to Unit" in this manual.
Handle
Unit Cover
Screw
Fronl Panel
Front InstalLation
install the front panel with filter as follows:
1. Adjust the horizontal louvers to the straight
position. Hold the front straight until the vertical
louver handle lines up between the bottom
horizontal louver and the discharge opening.
2o Press the front stralght onto the cabinet until the
holes in the flangeofthe plasticfront lineupwlth the
screw holes in the metal cabinet. Fasten the front in
place with the two screws provided°
Horizonta{ Louver
3