Installation Checklist
A. Water Heater Location
B. Water Supply
C. Gas Supply
D. Relief Valve
E. Venting
Close to area of vent termination.
Indoors and protected from freezing
temperatures.
Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.
Sufficient fresh air supply for proper
operation of water heater.
Air supply free of corrosive elements and
flammable vapors.
Provisions made to protect area from water
damage.
Sufficient room to service heater.
Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base
of the heater.
Clearances of 1” (2.54cm) from combustion
air inlet openings observed.
Water heater completely filled with water.
Air purged from water heater and piping.
Water connections tight and free of leaks.
Gas line equipped with shut-off valve, union
and sediment trap.
Approved pipe joint compound used.
Soap and water solution used to check all
connections and fittings for possible gas leak.
Gas Company inspected installation (if
required).
Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.
Discharge line protected from freezing.
Vent length verified.
Heater vented separately from all other
appliances.
Proper materials and techniques used in vent
assembly.
Vent pipe properly secured to blower
housing.
Vent termination/screen installed.
Vent pipe supported at required intervals.
Appropriate minimum clearance observed.
Precautions taken to prevent moisture
damage around vent termination.
F. Wiring
Correct power supply (120V) 50/60 Hz.
Electrical Connections tight.
Heater properly ground and proper polarity
observed.