Ensuring the fixing lugs and locating pins
are correctly aligned, carefully place the
valve end cap onto the on/off lever and click
into position.
23
Adjustable height head installation
Prepare pipe work from the shower valve to
the required position for the hose outlet using
a ø15mm copper pipe. Slide the 15mm gripper
ring down the projecting pipe up to the wall
face.
1
Trim the projecting pipe to a length of 15-22mm using a rotary type cutter.
If a hacksaw is used, the pipe end must be carefully de-burred and chamfered.
2
Clean and lubricate the pipe using a suitable (silicone based) lubricant.
3
Remove the wall outlet cover plate and carefully slide the wall outlet onto the
projecting pipe. Turn to the required position and mark the screw holes on the
wall face.
4
Remove the wall outlet and drill and prepare
suitable wall fixings. Ensure the projecting pipe
is clean and lubricate again if necessary.
Refit the wall outlet and secure it to the wall
using the screws provided.
5
Refit the wall outlet coverplate.