2. Preparation before installing
Please use the specified hanging bolt in any case.
Hanging bolt is local supply.
Please use the method below or use the angle and the
rectangular lumber, etc. and install the hanging bolt.
Insert etc
100-150kg
Hanging bolt
M10 (PEH-5,PE(H)-7,8,10)
M12 (PE(H)-15,20)
Reinforcement
Indoor unit
- 90 -
300 over
A
A
AA
If this side is
service panel, you
need 500 over.
If this side is inlet,
you need 300 over.
Fig 6 All "A" is 500 over.
The obstacle is on the outlet side. (Fig 1)
The obstacle is in four directions. (Fig 2)
The obstacle is in three directions. (Fig 3,4)
Fig 1
(2) Relation of unit when many set up unit. (Fig 5,6,7)
Fig 5
ceiling
1500
over
300 over
300 over
Service-panel
Service-panel
The right and left side
and the back and forth
side must be opened.
However, outlet side
must be opened.
And the obstacle in
two directions must be
lower than the unit.
500
over
PUH-15, 20
(1) At a single installation
If this side is
service panel, you
need 500 over.
If this side is inlet,
you need 300 over.
AAA
Fig 7 All "A" is 500 over in any case.
If this side is
service panel, you
need 500 over.
If this side is inlet,
you need 300 over.
500 over
Service Panel
However, the outlet side must be opened.
Fig 3 Fig 4
300 over
500 over
Service-panel
Service-panel
300 over 300 over
Fig 2
300 over 300 over
500 over
300 over
300 over