Manitowoc Ice Q Vacuum Cleaner User Manual


 
Section 2 Installation Instructions
2-11
Connection to Ice Machine (cont.)
VINYL TUBING CONNECTION
1. Insert the tubing into the ½” conduit from the
AuCS
to the ice machine.
2. Slide the 3/8” hose clamp (B) onto the tubing and
connect it to the barbed fitting on the AuCS
dispenser pump.
Connecting Vinyl Tubing to Dispenser Pump
Using 3/8” Hose Clamp (B)
3. Route the tubing through the bulkhead heyco
fitting and into the water compartment.
4. Determine the amount of tubing required and cut
off the excess.
5. Slide the 3/8” hose clamp (Part B) onto the tubing
and connect it to the water inlet barbed fitting.
AuCS
®
INLET
WATER INLET
3/8” HOSE CLAMP (B)
8’ VINYL TUBING
SV1644G
Connecting Vinyl Tubing to
MODULAR WIRE LEAD
Water Inlet Barbed Fitting
SV1643G
AFTER INSTALLATION
WARNING
Read and understand this entire manual prior to
operation of the AuCS
A accessory. You must
understand all warning and caution statements and
follow all safety precautions to assure proper
operation of the AuCS
A accessory.