22
Check List
CHECK LIST OF STEP-BY-STEP GUIDES TO
INSTALL
Review the following list to ensure you have completed all
the installation procedures.
____1. Check the incoming water. Has incoming water
been tested?
____2. Remove cardboard packaging from salt tank.
____3. Is the incoming water going to the valve inlet?
____4. Is the bypass valve placed into the service
position?
____5. Is the ground clamp installed?
____6. Are the drain lines clamped and secured?
____7. Is the unit plugged into a continuously live outlet?
____8. Has salt been added to the salt tank?
____9. Has the unit been sanitized? See page 20.
Valve Inlet
Water Supply
FIG. 30
3-Valve
Plastic
Outlet
Valve
Inlet
Valve
Note: Stem may be installed in
either direction. The end with writ-
ing should be pulled out for service
position.
Bypass
Valve
Bypass Valve(s)
FOR SERVICE
Close bypass valve.
Open inlet & outlet
valves.