Hearth and Home Technologies CFX-Crescent Indoor Fireplace User Manual


 
Heat & Glo • CFX-CRESCENT • 705-900 Rev. P • 12/0722
If the area above the ceiling IS an attic, position and
secure the firestop on top of the previously framed hole.
NOTE: There must be NO insulation or other
combustibles inside the framed firestop opening.
This shows an attic
installation.
1. Keep insulation away
from the vent pipe at
least 1 inch (25 mm).
Figure 16. Attic Firestop
C. Vent Termination
For Horizontal Terminations - The trapezoidal cap
SLK-01TRD is the only cap that is approved to
terminate a horizontal vent run.
To attach and secure the termination to the last
section of horizontal vent:
Rotate and interlock the ends as described at the
beginning of the Installing Vent Components
section.
The termination kit should pass through the wall
firestops from the exterior of the building.
Adjust the termination cap to its final exterior
position on the building (see Figure 17).
CEILING
CEILING FIRESTOP
RAFTER
NAILS (4 REQUIRED)