Heat & Glo • 6000GBV, 6000GBV-IPI • 2104-900 Rev. H • 11/08 35
Figure 14.13 Top View
Figure 14.7 Top View
STEP 5. Log #3 (SRV2103-110): Place log #3 on top of the burner surface in front of the hump. The bottom of
the log has a square groove cut through it. The groove sits over the second grate tine from the left. Slide it back against the
hump.
STEP 4. Log #2 (SRV2103-108): Place log #2 on top of the left side of log #1. The bottom of this log has a slot in it
that goes over the tab molded into the top of log #1. The left end sits behind the simulated ember cluster on the burner top.
STEP 6. Log #4 (SRV2103-109): Place log #4 on top of the right side of log #1. The bottom of this log has a slot
in it that goes over the tab molded into the top of log #1. The other end of the log rests on the grate, against the second tine
from the right.
STEP 7. Log #5 (SRV2103-111): Place log #5 in front of log #3 the notch in the bottom of this log rests over the
center tine on the grate. The log shouldn’t cover any ports.
Figure 14.9 Top View
Figure 14. 11 Top View
2
2
3
3
4
4
5
5
3
3
5
5
4
4
Figure 14.6 Front View
Figure 14.8 Front View
Figure 14. 10 Front View
Figure 14.12 Front View
2
2