Haier AU84NATEAA Air Conditioner User Manual


 
Blow out
Absorb in
Absorb in
Absorb in
Working, repair surface
Warning
It should be installed at places where it is firm enough to withstand the weight of the air conditioner to prevent falling.
Typhoon and earthquake prevention. It should be installed according to specific requirements. Inappropriate installation
may lead to accidents.
Obstacles should be 2000mm off the top of the outdoor unit. Obstacles nearby
should be 400mm lower than the top of the unit.
As there is no protective package for the outdoor unit, so the following points
merit attention:
(1)When forklift is used, insert the fork into the holes in the base plate.
(2)When crane is used, lift the unit with 4 pieces of steel rope with diameter
above 6 mm.
(3)Put protective materials between the cable and the unit to prevent deformation
and damage of the surface.
(1)During installation, connect the outdoor unit and align the mounting surface
(See the figure on the right). Mount the electric distribution device on the
external side of the unit in accordance to the installation instructions for
electric distribution device.
Installtion space
Installation Precedure
19
Note:
1. Selecting the installation place
A vertical view of the outdoor unit
>20mm >20mm
>1000mm
(front side)
>20mm
>300mm
>20mm
2. Delivery of outdoor unit
1550
1000
660
140
795
750
660
Dimension of outdoor unit
(2)To ensure good performance of the machine and facilitate installation and
maintenance, adequate space must be reserved (See figure on the right).
Outdoor Unit
20
Base panel
Wire rope
Wire rope
Protection cushion