GTO SL-2000 Garage Door Opener User Manual


 
33
DUAL GAT E SYSTEM INSTALLATION
(2) Chain Brackets
Operator Housing
32’ Drive Chain
Second Gate Operator
(2) 2” square x 48” long legs
60’ Power Cable
w/ Strain Relief
Install the second gate operator in the same manner as the Single gate operator starting on page 14 of this
manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two
pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in
which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins on
page 37.
SECOND GATE (AUXILIARY) OPERATOR PARTS & HARDWARE
Battery Cable
Battery
The SL-2200 comes
with a battery and
control box the SL-1200
does not.
(4)
3
/
8
”-16 x 2” diameter U-Bolts and
(8)
3
/
8
Serrated Nuts (RB210)
(2) Quick Release Pins (211IH)
(2) Chain Master Links
(RB208)
(4)
1
/
4
-20 x
1
/
2
Screws
(RB226)
(4)
3
/
8
-16 x 3
Carriage Bolts (RB659)
(4)
3
/
8
Nuts
(RB668)
(4)
3
/
8
Lock Washers
(RB641)