timate stability will be achieved 10 to 20 minutes after reaching the set
temperature.
Inserting a cold probe into a well will require another period of stabilizing de
-
pending on the magnitude of the disturbance and the required accuracy. For ex
-
ample, inserting a .25 inch diameter room temperature probe into a sleeve at
300°C will take 5 minutes to be within 0.1°C of its settled point and will take
10 minutes to achieve maximum stability.
Speeding up the calibration process can be accomplished by knowing how soon
to make the measurement. It is recommended that typical measurements be
made at the desired temperatures with the desired test probes to establish these
times.
9140 Dry-well Calibrator
User’s Guide
42