ULTRA FLAME DIRECT VENT GAS STOVE 16
Gas Piping
• Move the ULTRA FLAME to the desired position.
• Mark the location for the gas inlet pipe and the
location where the vent pipes will go through the
wall. Remove the appliance.
• Route a 3/8" minimum NPT iron pipe gas line to the
desired location.
• Install a shutoff valve to the gas line. Tighten
securely using a pipe joint compound.
• Check the gas line piping for leaks. Use a soap and
water solution.
CAUTION: Do not use open flame to check leaks.
Electrical Connections
If you wish to make a direct electrical connection to the blower without using the six-foot cord supplied, route a
120 volt, 60 Hz electrical power supply line to the same location. Remove the power cord and connect the
120V line as per the following procedure:
• Unscrew the speed control unit and pull a few inches away from the junction box
• Unscrew the two marr connectors attached to the cord (P) and the cord ground
• Remove the cord and route the supply line through the same holes
• Make the electrical connection with the same wires the cord was attached to
• Screw the ground wire to the junction box (G)
• Screw the speed control unit back in place
P
P
G
CONNECT THE POWER LINE TO THE SAME
WIRES THE CORD WAS CONNECTED TO (P)
SPEED CONTROL
JUNCTION BOX
If you prefer to use the six-foot cord supplied, just connect it to a 120V outlet.