Drolet GTX-I Stove User Manual


 
18
Through Roof Framing
Maintain 10” opening relative to the pitch of the roof.
Use a suitable round or square support through the roof. Ensure adequate heat shield protection is provided.
Termination above Roof
Consult local codes for minimum vent cap height above the roof .
To prevent water seepage; install the flashing with upper portion slid under the roofing material and the lower
portion over the roofing material.
Note: do not fasten down until the final adjustments to the vent have been made.