www.desatech.com
108382-01G 15
INSTALLATION
Continued
Figure 18 - Installing Bottom Log (#1)
Bottom Log (#1)
Burner
Chassis
Grate
Burner Port
Figure 19 - Installing Log set (Top View)
Logs
Burner Ports
Figure 20 - Installing Top Log (#2)
Top Log
(#2)
Peg
3. Position log piece (#3) by aligning holes on
underside with remaining pegs on bottom log
(see Figure 21, page 16).
4. Place lava rock around base of heater.
PRESSURE TESTING HEATER GAS
CONNECTIONS
1. Open equipment shutoff valve (see Figure 15,
page 14).
2. Open main gas valve located on or near gas
meter for natural gas or open propane/LP
supply tank valve.
3. Make sure control knob of heater is in the OFF
position.
4. Check all joints from equipment shutoff valve
to control valve (see Figure 16 or 17, page 14).
Apply a noncorrosive leak detection uid to gas
joints. Bubbles forming show a leak.
5. Correct all leaks at once.
6. Light heater (see Operating Heater, pages 16).
Check all other internal joints for leaks.
7. Turn off heater (see To Turn Off Gas to Appli-
ance, page 17).
INSTALLING LOGS
CAUTION: After installa-
-
It is very important to install the logs exactly as
instructed. Do not modify logs. Only use logs
supplied with heater.
1. Place bottom log (#1) on grate to t as illustrated
in Figure 18. Make sure open areas of log set line
up with burner ports (see Figure 19). Log will t
securely on chassis. IMPORTANT: Make sure
log does not cover any burner ports.
2. Facing front of unit, place top log (#2) onto
the pegs in the center of the bottom log (see
Figure 20).