Clearances
4
21"
7-3/4"
10-1/4"
Side View
FLOOR
On Each Side
(not supplied)
14"
96"
(MIN)
(MIN)
(MIN)
1/2" Conduit
Drip Leg
(not supplied)
Gas Shut
(not supplied)
Gas Pipe
(not supplied)
Utilize 2
bolts (min)
per bracket.
Utilize 2
bolts (min)
per bracket.
Surface
Combustible
Off Valve
Four Bolts Two
0
0
Installation
Minimum clearances to combustible material.