Coway BA08-AE Plumbing Product User Manual


 
22
Installation the Product
5. Push xing screw into the xing slider. And slide the
xing slider with xing screw to be hooked in the
installation boad.
6. Insert xing screw into the holes and pushxing
rubber, xing washer into the xing screw to prevent
from wobbling of the main body. Then tighten up the
xing nuts.
Ifyoudonottightennuts.Itmaycauseinjuryordamageto
customer.
7. Please connect the bidet hose to the lter xing
stopper.
Pleaseshortenthebidethoseassoonaspossible.Ifthebidet
hoseislong,itmaycausenoises.
8. Open the main water supply valve.
9. Connect the power plug to the electrical outlet.
Makesuretouseagroundedelectricaloutlet.Inthecaseofshort
circuit,groundingpreventselectricshockorinjury.
Makesuretouseadedicatedelectricaloutletwithgrounding
terminals.
Ifitisunavoidabletouseanextensioncord,useonewith
groundingterminalsforpowerratingof125V~,7Aorhigher.
INSTALLATION
Grounding
terminals
1021214 BA08-A 사용설명서_미주향_(09.06.10)_003.indd 22 2009.6.10 6:17:1 PM