Carrier 42 SERIES Air Conditioner User Manual


 
Hydronic Coil Arrangement
FIELD PIPING CONNECTIONS*
VERTICAL FLOOR UNITS — 42VB, VE, VF
Pipe into cabinet end compartment
(opening in bottom and back).
VERTICAL FLOOR UNITS 42VA, VC
Pipe to external connections (no cabinet).
CEILING UNITS (EXPOSED) — 42CG, CK,
DE, DF
Pipe through knock-outs in rear of cabinet to
coil and valve package connections.
CEILING UNITS (CONCEALED) 42CA,
CE, CF, DA, DC
Pipe to connections extending from end of
unit.
VERTICAL UNITS 42DD
Pipe to stub connections extending from side
of unit.
HORIZONTAL AIR HANDLERS (BELT
DRIVE) 42BH
Pipe to stub connections extending through
side of unit.
Valve packages are not factory supplied with
these units.
WALL UNITS, FURRED-IN
Pipe to stub connections at the side of unit.
or into optional piping compartment. Op-
tional piping compartment is required if valves
are factory installed. Factory installed valve
package is limited to one 2-way or 3-way mo-
torized valve and 2 hand valves.
*Location of field piping connections will vary depending on number of coil rows on factory-
supplied coil or arrangement of factory-supplied valves.
15