6
TABLE 4.2: CLEARANCES FROM VENT PIPING TO COMBUSTIBLE CONSTRUCTION
TYPE OF VENT PIPE PIPE DIRECTION ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
MATERIAL
60/100mm
CONCENTRIC VENT-
ING
VERTICAL OR
HORIZONTAL
ENCLOSED ON ALL FOUR
SIDES
0”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
VERTICAL OR
HORIZONTAL
AT LEAST ONE SIDE OPEN,
COMBUSTIBLE MATERIAL ON
A MAXIMUM OF THREE SIDES
1”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
HORIZONTAL OR VERTI-
CAL WITH OFFSETS
ENCLOSED ON ALL FOUR
SIDES
2-1/2”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
VERTICAL WITH NO OFF-
SETS
ENCLOSED ON ALL FOUR
SIDES
2-1/2”