Bryant T6-NAC Thermostat User Manual


 
20
A07219
Fig. 14 Equipment Control Module
5. Match and connect equipment wires to proper terminals of each connector
block.
6. Push any excess wire into wall and against Equipment Control Module.
Seal hole in wall to prevent air leaks. Leaks can affect operation and cause
incorrect temperature and/or humidity measurement.
7. Remove 2wire pigtail from thermostat mounting base and attach to
Equipment Control Module terminal block (terminals V+ and Vg). Attach
2wire pigtail to the back of the Display Module via 2 pin, keyed connec-
tor.
8. Reattach Display Module body to Equipment Control Module by first
setting on at top and then push bottom corners to snap into place. See Fig.
15.