Bradley Smoker MG-2/BIR3 Plumbing Product User Manual


 
5
Express® Lavatory System - MG Series with Battery Infrared Control
Installation Instructions MG-2/BIR3
Bradley Corporation • 215-1510 Rev. D; ECN 07-815 8/23/07
Installation Instructions
Step 1: Rough in supplies and optional hot water heater
NOTE: See Figure 1 (below), 1a, 1b (for TAS on page 6) and Figure 2 (on page 7) when roughing
in the MG-2/BIR3 Express®.
IMPORTANT: Flush the supply lines before making connections. Debris in supply
lines will cause the valves to malfunction.
IMPORTANT: Dimensions shown in Figure 1 are for Standard Height Mounted
MG-2/BIR3 Express®.
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
4"
(102)
FLOOR
APPROX. DIMENSION
14"
(356)
14"
(356)
*28-1/4"
(718)
*25-3/4"
(654)
1/2" NPT HOT AND COLD
SUPPLIES OR TEMPERED
SUPPLY – STUB OUT 2"
1-1/2" NPT DRAIN
STUB OUT 2"
3/8" WALL ANCHORS (8) PLACES MIN. PULL-OUT
STRENGTH 1000 LBS. PER ANCHOR
*Juvenile Height Mounting:
Subtract 4" from vertical dimensions for compliance with ADA guidelines for children's use.
Figure 1
Standard Height Mounting
CENTERLINE
OF FIXTURE
*24-1/2"
(654)
*26"
(660)
*31-1/2"
(800)
*19-1/2"
(495)
4"
(102)
4" (102)
H
C
25-1/2" (648)
APPROX. DIMENSION
25-1/2" (648)
A A
B
BB B
B
B