10
Installation (Venting) continued-
Figure 2
Water Connections
NOTE: BEFORE PROCEEDING WITH THE INSTALLATION, CLOSE THE
MAIN WATER SUPPLY VALVE.
After shutting off the main water supply, open a faucet to relieve the water line
pressure to prevent any water from leaking out of the pipes while making the
water connections to the water heater. After the pressure has been relieved,
close the faucet. The COLD water inlet and HOT water outlet are identified on
the top of the water heater. The fittings at the cold water inlet and hot water
outlet are dielectric waterway fittings with 3/4” NPT male thread. Make the
proper plumbing connections between the water heater and the plumbing
system to the house. Install a shut-off valve in the cold water supply line.
CAUTION
If sweat fittings are to be used, DO NOT apply heat to the nipples on top of the
water heater. Sweat the tubing to the adapter before fitting the adapter to the
water connections. It is imperative that heat is not applied to the nipples
containing a plastic liner.
WARNING
FAILURE TO INSTALL AND MAINTAIN A NEW, LISTED 3/4” X 3/4”
TEMPERATURE AND PRESSURE RELIEF VALVE WILL RELEASE THE
MANUFACTURER FROM ANY CLAIM WHICH MIGHT RESULT FROM
EXCESSIVE TEMPERATURE AND PRESSURES.