APC NS1435A Indoor Furnishings User Manual


 
NetShelter CX Enclosure: Installation and Customization8
Installation
Installation and Setup
If equipment mounting rails are adjusted from their standard factory installed positions to a deeper
position, such as in a networking application, the levelling feet must be used.
Note: The bottom trim and leveling feet are packaged separately and placed in the enclosure.
Leveling the enclosure and installing bottom trim
Level the enclosure before installing equipment.
The leveling feet at the corners provide a stable base if the floor is uneven, but they cannot compensate
for a badly sloped surface.
1. Move the enclosure to a level location.
2. For each leveling foot turn the leveling
foot clockwise to extend the leveling foot
until it makes firm contact with the floor.
3. Install the front and side bottom trim.
The enclosure can be leveled after equipment has been
installed. Turn the leveling foot clockwise to extend the
leveling foot until it makes firm contact with the floor.
Rack stabilization options
Lock the casters for additional stabilization.
ns1456a
ns1590a