American Water Heater VG6250T 110 Water Heater User Manual


 
34
NOTE: Do not allow insulation or other materials to accumulate
inside pipe assembly when installing through hole.
5. Secure assembly to roof structure as shown in “Figure: 27”
using field supplied metal strapping or equivalent support
material.
NOTE: Ensure termination height is above the roof surface or
anticipated snow level as shown in “Figure: 27”.
6. Install rain cap and small diameter pipe assembly in
roof penetration assembly, Ensure small diameter
pipe is cemented and bottomed in Y concentric fitting.
7. Cement water heater combustion air intake and vent pipes to
concentric vent termination assembly. See “Figure: 27” for
proper pipe attachment.
8. Operate heater through 1 heat cycle to ensure combustion
air and vent pipes are properly connected to concentric vent
termination connections.
FLAT ROOF INSTALLATION
When installing a concentric termination vertically through a flat
roof, the termination’s vent cap must be a minimum of 10 feet (3
m) away from any parapet, vertical wall or structure as shown
in Figure 27A.
If this required 10 foot (3 m) distance to a parapet, vertical wall
or structure cannot be maintained, standard terminations must
be used. See Vertical Termination Installation.
CONCENTRIC TERMINATION(S)
MUST BE A MINIMUM OF 10 FEET
(3 m) AWAY FROM ANY PARAPET,
VERTICAL WALL OR
STRUCTURE.
CONCENTRIC TERMINATION
FLAT ROOF CLEARANCE
Figure: 27A
INSTALLATION SIDE WALL TERMINATION
Figure: 28
1. Determine best location for termination kit.
NOTE: Consideration for the following should be used when
determining an appropriate location for the termination kit:
Termination kit positioned where the vent vapors will not damage
plants/shrubs or air conditioning equipment.
Termination kit positioned so it will not be affected by wind eddy
that may allow recirculation of combustion products, or airborne
leaves, or light snow.
Termination kit positioned where it will not get damaged or be
subjected to foreign objects, such as stones, balls, etc.
Termination kit positioned where the vent vapors will not be
objectionable.
NOTE: See Venting Installation section (starting on Page 25) in this
manual for additional vent location requirements.
2. Cut 1 hole (5 in. diameter).
3. Partially assemble concentric vent termination kit.
a) Cement the Y concentric fitting to larger diameter
kit pipe, see “Figure: 19”.
b) Cement the rain cap to the smaller diameter kit
pipe, see “Figure: 26”.
NOTE: Instead of cementing the smaller pipe to the rain cap, a
eld-supplied stainless steel screw may be used to secure the 2
components together when eld disassembly is desired for cleaning,
see “Figure: 26”.
When using alternate screw assembly method, drill clearance hole
in rain cap and pilot hole in vent pipe for screw being used. Failure
to drill adequate holes may cause cracking of PVC components,
allowing combustion products to be recirculated. Failure to follow
this warning could result in personal injury or death.
Do not operate the heater with rain cap removed or recirculation
of combustion products may occur. Water may also collect inside
larger combustion-air pipe and flow to the burner enclosure. Failure
to follow this warning could result in product damage or improper
operation, personal injury or death.
4. Install Y concentric fitting and pipe assembly through
structure’s hole.
NOTE: Do not allow insulation or other materials to accumulate
inside pipe assembly when installing through hole.