Nilfisk-ALTO R 680 P Vacuum Cleaner User Manual


 
ENGLISH USER MANUAL
18 FLOORTEC R 680 P 1463514000(1)2008-05 A
MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
The following table provides the scheduled maintenance. The intervals shown may vary according to particular working conditions,
which are to be de ned by the person in charge of the maintenance.
All scheduled or extraordinary maintenance procedures must be performed by quali ed personnel, or by an authorised Service
Center.
This Manual describes only the easiest and most common maintenance procedures.
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be consulted
at any Service Center.
WARNING!
To perform maintenance procedures, the machine must be off, the ignition key removed, and, if necessary, the
batteries must be disconnected.
Before performing any maintenance procedure, carefully read the instructions shown in Safety chapter.
SCHEDULED MAINTENANCE TABLE
Procedure
Upon
delivery
After the rst
5 hours
Every 10
hours or
before use
Every 25
hours
Every 50
hours
Every
100
hours
Every
200
hours
Every
year
Engine oil level check
Battery uid level check
Side and main broom height check
Engine air pre- lter cleaning (3)
Frame dust lter cleaning and integrity
check
Hopper hydraulic lifting system oil
level check
Drive system oil level check
Skirt height and operation check
Fuel lter cleaning
Spark screen check and cleaning
Engine oil change (2)
Filter shaker operation check (1)
Brake adjustment (1)
Driving wheel chain cleaning and
tension check
(1)
Closed pocket lter cleaning and
integrity check
Vacuum system ef ciency check (1)
Driving belt visual inspection (1) (1)