AC International SELF-PRIMING CENTRIFUGAL PUMPS Heat Pump User Manual


 
OM--04760 SELF-PRIMING CENTRIFUGAL PUMPS
PAGE I -- 1
INTRODUCTION
INTRODUCTION
Thank You for purchasing a Gorman-Rupp Self-
Priming Centrifugal Pump. Read this manual
carefully to learn how to safely install and operate
yourpump. Failure todo socould result in personal
injury or damage to the pump.
A set of three manuals accompanies your pump.
Each set consists of three parts; the
Installation/
Operation Manual
contains essential information
on installing and operating the pumps. However,
since pump installations are seldom identical,
some of the information only summarizes general
recommendations and practices required to in-
spect, position, and arrange the pump and piping.
The Parts List Manual
provides performance
curve(s), a pump model cross-section drawing,
and parts list for your pump.
The Maintenance and Repair Manual
provides
troubleshooting and maintenance instructions re-
quired to properly diagnose operationalproblems,
and to service the pump components.
Because pump i nstallations are seldom identical,
this manual cannot possibly provide detailed in-
structions and precautions for every aspect of
each s pecific application. T herefore, it is the r e-
sponsibility of the owner/installer of the pump to
ensure that applications not addressed in this
manual are performed only after establishing that
neither operator safety nor pump integrity are com-
promised by the installation. Pumps and related
equipment must be installed and operated ac-
cording to all national, local and industry stan-
dards.
If there are any questions regarding the pump
which are not covered in this manual or in other lit-
erature a ccompanying the unit, please contact
your Gorman-Rupp distributor or the Gorman-
Rupp Company:
The Gorman-Rupp Company
P.O. Box 1217
Mansfield, Ohio 44901--1217
or:
Gorman-Rupp of Canada Limited
70 Burwell Road
St. Thomas, Ontario N5P 3R7
CONTENTS
SAFETY -- SECTION A
INSTALLATION -- SECTION B
GENERAL INFORMATION PAGE B --- 1.....................................................
PREINSTALLATION INSPECTION PAGE B --- 1...............................................
POSI TI ONI NG PUM P PAG E B --- 1..........................................................
SUCTION AND DISCHARGE PIPING PAGE B --- 2............................................
AUTOMATIC AIR RELEASE VALVE PAGE B --- 5..............................................
ALIGNMENT PAG E B --- 7.................................................................
ELECTRICAL CONNECTIONS PAGE B --- 9..................................................
OPERATION -- SECTION C
PRIMING PAG E C --- 1....................................................................
STARTING PAG E C --- 1...................................................................
OPERATION PAG E C --- 2.................................................................
STOPPING PAG E C --- 3...................................................................
BEARING TEMPERATURE CHECK PAGE C --- 4.............................................
LUBRICATION PAG E C --- 4................................................................