3M FSTMO75 Water System User Manual


 
7
Tools Required:
Piece of 1/4” tubing or Bucket
Bicycle or tire pressure gauge
Bicycle tire pump
1) Empty the storage tank.
a. Shut off the inlet water valve and Water Booster System if applicable.
b. Make sure tank shut-off valve located at the top of the water tank is open.
c. Attach a piece of tubing from the water sample valve to drain OR use a bucket to catch water from the water sample valve.
d. Open the water sample valve and drain the tank until empty. Leave water sample valve open.
2) Unscrew the blue cap on the side of the tank to expose the Schrader Air Valve.
3)
4)
Read the tank's air pressure using a standard bicycle or automobile tire pressure gauge that is capable of reading pressure
accurately from 0-10 psi (0 - 68.9 kPa).
5)
The air pressure should be between 8 -10psi (55.2 - 68.9 kPa).
6)
If the air pressure is below 8 psi (55.2 kPa) or above 10 psi (68.9 kPa) complete the following steps.
a. Using a standard bicycle pump add or release air pressure in the tank.
b. Repeat Steps 4-5 until the pressure is 8-10 psi (55.2 - 68.9 kPa).
c. Make sure the blue cap is put back onto the air pressure port.
7)
Close the water sample valve.
8)
Open the tank shut-off valve. Turn on the inlet water valve and booster pump if they were turned off.
Allow 60 minutes for tank to fill before operating the steamer.
To reduce the risk associated with property damage due to water leakage:
• Tank Pressure should be checked yearly.
CAUTION
Tank Pressure Check
Part Number Description
54-3030 Stainless Steel bracket complete with filter heads and RO shut-off valve
56-161351 Tank
60-23298 Tank shut-off valve
30-6049 Tank banding clamp
55706-08 Pre-filter cartridge-Must be replaced every twelve months or at the specified service cycle.
55987-15 RO module-Must be replaced every 24-36 months or at the specified service cycle.
60-232270 Inlet water valve
82-11302 3/8" blue tubing -1 ft (30.5 m)
82-11205 1/4" red tubing - 10 ft (3.05 m)
52-318203 2 3/4” Stealth flow control tube assembly
68512-03 Water Sample Valve Assembly (Includes 3/8” Reducing Tee, tubing and 1/4”Shut-off Valve)
74-3560404 1/4” x 1/4” Stem x Barb Adapter
74-3560604 3/8” x 1/4” Stem x Barb Adapter
Replacement Parts
9)
Pull down on RO cartridge. 4)
Discard used RO cartridge. 5)
Remove red cap from new RO cartridge and moisten the o-ring with water. 6)
Insert new RO cartridgeinto the filter head. Be sure that the ears on the cartridge line up with the spaces in the head. 7)
Turn new cartridge 1/4 turn to the right. 8)
Open tank shut-off and inlet valves (see Figure 2)
RO Membrane Cartridge (Replace every 24-36 months) continued
10) Divert the Water Sample Valve outlet to drain.Open valve and let water run through the RO system to drain for 10 minutes.
11) Close valve. NOTE: Please allow the water tank to fill (approximately 60 minutes) before using steamer.