A SERVICE OF

logo

18
ELECTRICAL CONNECTIONS
A power cable (3 mt.) is provided with your analyzer. How-
ever, if access to the terminal block is required, see below.
Warning Electrical connections should be installed only by qualified
personnel to assure conformity to applicable electrical codes.
Unplug the meter before any electrical connection.
Power
Power connections are made at a terminal block located in
the center of the electrical compartment to the right of the
fuses.
Hard wiring with 13 mm (½") conduit is recommended and
usually required by most municipal electrical codes.
Warning Before connecting the instrument to the line:
1) Check the sticker near the fuses for proper voltage.
2) Be sure the power cord is not connected to the line.
3) Open front panel.
4) Remove the cover screws (Allen head).
5) Do not remove peristaltic pump or motor.
6) Unplug all alarms and recorder jacks.
Feed the power cord through the watertight grommet and
tighten the grommet nut. See the picture below for proper
wire connections.