![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/0/c5/0c571298-6899-4cf2-95ab-2b8a3cf7f957/0c571298-6899-4cf2-95ab-2b8a3cf7f957-bgd6.png)
EPSON Stylus Pro 7600/9600 Revision A
Adjustment Overview 214
5.1.4.3 CR Motor Adjustment
Described below are the adjustment items to be made once the CR Motor ASSY (p.180)
has been replaced.
Adjusting tools:
No special tools are required.
Adjustment items (steps):
5.1.4.4 PF Motor Adjustment
Described below are the adjustment items to be made once the PF Motor (p.185) has
been replaced.
Adjusting tools:
Tension gauge (for 4,000g)
PF ENC sensor positioning tool #F798
Scale 1000mm #F713
Scale Stopper #F714
Adjustment items (steps):
Table 5-5. Required Adjustment Items (CR Motor Replacement)
Step Adjustment Item See
1 Clear the counter (Maintenance Mode2)
(Power OFF →[Paper Source]+[Eject]+[Paper Feed]
→ Power ON) “CR MOTOR”
p.70
<Mechanism Adjustment>
2 CR Timing Belt Tension Adjustment p.263
<Start the Self-diagnostic Function>
(Power OFF →
[Paper Feed
∆
]
+
[Paper Feed
∇
]+[Cut/Eject]
→ Power ON)
p.220
3 Round Trip Print Position Adjustment (Bi-D Adjustment) p.248
4 Round Trip Print Position (Bi-D Adjustment) Checking p.252
5 Head Gap Adjustment (Uni-D Adjustment) p.253
6 Test Pattern Printing p.255
Table 5-6. Required Adjustment Items (PF Motor Replacement)
Step Adjustment Item See
<Mechanism Adjustment>
1 PF Timing Belt Tension Adjustment p.264
2 PF ENC Installation Position Adjustment p.272
<Start the Self-diagnostic Function>
(Power OFF →
[Paper Feed
∆
]
+
[Paper Feed
∇
]+[Cut/Eject]
→ Power ON)
p.220
3 Feed Correction + T&B Adjustment p.239
4 Test Pattern Printing p.255